
All equipment, system configuration and operation are tested either off-site, before installation, or on-site, after installation.
Description | Code |
---|---|
Commissioning. System commissioning on-site. |
SBG-CM1 PD |
All equipment, system configuration and operation are tested either off-site, before installation, or on-site, after installation.
Description | Code |
---|---|
Commissioning. System commissioning on-site. |
SBG-CM1 PD |